Monday 8 March 2010

Work




Spent a long day (7am - 6pm) moving rocks from one place to the next. Over the beach into a pile, from the pile into the van, down the point, from the van onto the floor, from the floor into the bucket/ box lift and across to the tank blocks and finally out of the bucket onto the tank block then finally into the gabion.



I also emptied the two test gabions ad moved the contents over to the tank block area where I was working.



At one point I thought one of the gabions had been stolen but it later turned up in the hedge row, apparently taken by scrap hunters by mistake, apart from-this one highlight the day was one of graft and I am now rather tired. Still a lot to do however and the jury is out over the final work.

No comments:

Post a Comment